Contact

Technology Transfer for Foaming Agents and Foaming Generators

Tell us about your market, foaming-agent licensing goals, generator manufacturing plans, and lightweight cellular concrete applications.

Start a conversation

Include your market, manufacturing goals, and intended applications when you get in touch. Sharing target output, available utilities, local cement and sand sources, and project constraints helps frame an initial technical discussion.

Email LCM

Project Scoping

Prepare for a productive technical review.

Useful early inputs include intended applications, indicative production volume, local raw materials, utility availability, and the expected manufacturing model. Project drawings and test data can help identify which questions need engineering review before a proposal is defined.

LCM technology and project discussion

Technical scope and project information

A scope review organizes target product, output, site conditions and available process inputs. Agreed assumptions define the equipment, training, validation and documentation requirements.

LCM project team and technology

Site utilities and manufacturing readiness

The site plan locates water, compressed air, power, storage, access routes and the mixing area. Utility capacities and safe operating arrangements are confirmed against the selected equipment documentation.

Project Photos

Manufacturing and equipment planning
Cellular concrete project planning

Technical Process

What we need to scope your project

Every project is scoped around the same inputs: intended use, target output, local material sources, available utilities and acceptance criteria. Formulation, foam generation, mixing, transfer, placement and inspection are planned as one workflow, not as separate operations.

No dilution ratio or cement-to-sand ratio can be fixed in advance. The recipe is established from product data, the mix design and the materials on site, then qualified through trial mixes before production release. A generator delivers steady foam only inside its verified operating envelope, with output matched to mixing and placement; capacity, pressure and flow are confirmed with equipment data and commissioning measurements. Pump and hose performance follow the mix, the route, the lift and the rate of placement.

Foam density, fresh concrete density, workability, material consumption and interruptions are recorded on a repeatable sampling plan. Placed material is protected, and curing, demoulding, loading and follow-on trades follow approved project criteria and strength evidence; curing time varies with formulation, geometry, temperature and humidity. In SIP assemblies the formwork is never removed, so the wall arrives already formed and insulated, with any insulation or cladding contribution designed and verified for that assembly.

Share project inputs

Provide application, target output, local material sources, utilities, site constraints, drawings, and approval context.

Identify validation needs

Scope mix trials, generator checks, pumping stability, density measurement, and curing criteria for the actual project.

Agree transfer responsibilities

Define equipment, training, commissioning, documentation, maintenance, and technical review milestones.

Technical Process Gallery

LCM project team and technologyManufacturing and equipment planningCellular concrete project planning